Blogs
About Us
Careers
Accreditions
Clients
Download Brochure
+(91)-8700781514
sales@matrixtestlabs.com
Latest News:-
IS 17882 : 2022 - We have added a new test facility for Measurement of Cycle Life and Energy Density for Advanced Chemistry Cells |
IS 16805:2018 / IEC 62619:2017 - Secondary cells and batteries containing alkaline or other non-acid electrolytes safety requirements for secondary cells and batteries, for use in industrial applications |
IS 16893 (Part 3):2018 / IEC 62660-3:2016 - Secondary lithium- Ion cells for the propulsion of electric road vehicles: Part 3 safety requirements |
IS 16893 (Part 2):2018 / IEC 62660-2:2010 - Secondary lithium- Ion cells for the propulsion of electric road vehicles: Part 2 reliability and abuse testing |
Home
Test Facilities
Products
Contact
Testing Facilities
ABNORMAL OPERATION
AC and D.C.power isolation
Accuracy of measurement equipment and measured values
Altitude simulation Test
Application for approval of REESS
Average Reading Method - Standby Power
Ball pressure test
Batteries and their protection circuits
Battery Charges for self contained emergency Luminaires
Battery Internal Resistance
Battery location
Battery safety system
Bump Road ability Test
Bump test
Button cells or batteries storage, small prismatic cells or batteries storage, cylindrical cells or batteries storage
Cap temperature rise
Carts, stands, and similar carriers
Case stress at high ambient temperature (battery)
Cell and battery designation and marking
Cell and battery internal resistance
Cell designation and marking
Change in Temperature
Change of temperature
Charge (Capacity) Recovery After Long Term Storage
Charge (Capacity) Retention
Charge (capacity) retention and recovery
Charge Acceptance At 55°C For LT, MT Or HTcylindrical Cells
Charging procedure for test purposes
Circuit power factor
Circuits intended for interconnection with building wiring
Classification
Classification and limits of electrical energy sources
Classification of Luminaire
Classification Of Luminaries
Classification of power sources (PS) and potential ignition sources (PIS)
Clearance, creepage distances and distance through insulation
Clearances And Creepage Distances
Clearances, Creepage distances and distances through insulation
Clearances, Creepage Distances And Solid Insulation
Cold
Cold Start Test
Cold test
components
Components as safeguards
Components requirements
Conditions of use
Connection to a main supply
Connection to cable distribution systems
Connection to power
Connection to telecommunication networks
Considerations for internalshort circuit-Design Evaluation
construction
Constructions details
Consumption measurement for low power modes
Continuous low rate charging (cells)
Cooking performance
Corrosion (Alkaline)
corrosion (salt or salt fog)
Corrosion salt
Creepage Distance and Clearance
Crush
Crush (cells)
Crush Test
Crushing of cells
Damp heat test
Defrosting performance
Design and construction
Designation of cell
Determination of Power Consumption
Dimension and volume
dimensions
Dimensions for the selected cell design
Discharge Performance At 0°C
Discharge Performance At -18°C
Discharge Performance At 20°C
Discharge Performance At -20°C
Discharge Performance At 20°C (Rated Capacity)
Discharge Performance At 25°C
Discharge performance at low temperature
Discharge performance for rapid charge cells (R cells)
Disconnection for the main supply
Display and storage
Disposal
Drop Test
Dry heat test
Duration of accelerated vibration tests
Duration of functional vibration tests
Dust and sand
Dust test
Efficiency
Electric shock hazard under normal operating conditions
Electric strength
Electrical Connections & Mechanical Fixing
Electrical Insulation
Electrical measurement
Electrical requirements and simulated abnormal conditions
Electrical tests
Electrical Tests General
Endurance
Endurance and Thermal tests
Endurance In Cycles
Energy and capacity at different temperatures and discharge rates- Purpose
Energy and capacity at different temperatures and discharge rates- Requirements
Energy and capacity at different temperatures and discharge rates- Test Procedure
Energy and capacity at RT- Purpose
Energy and capacity at RT- Test Procedures
Energy and capacity at RTDetermination of rated capacity
Energy consumption for the microwave function
Energy source classifications
Equipment containing coin OR button cell batteries
Equipment for direct insertion into mains socket-outlets
Equipment mounted to a wall, ceiling or other structure
Equipment stress screening
Evaluation and report
Evaluation of test criteria
Examples Of Cells
Explosion
External and Internal Wiring
External Flexible Cords
External Short Circuit Test
Fall Test
fault conditions
Finish
Fixing of conductors
Flammability Test
Forced discharge
Forced discharge (Cells
Forced discharge (Cells)
Forced Discharge Test
Free fall
Functional random vibration test conditions
Functional Requirements
general conditions for measurements
General conditions- Prerequisites
General provision for earth leakage
General Requirements
General safety considerations
General Test Conditions
Glow wire test
Hammer Tests
Handle strength
Handling of battery cartons
Hazardous Radiations
Heat Management
Heating
Heating performance
Heating Under Normal Operating Conditions
High rate Discharge Performance At 20°C
High rate permissible current
High temperature endurance test
Humidity
immersion
Impact Test
Incorrect installation (cells)
Information for safety
Ingress of protection (IP) test
Inputting and display of all the characters in English, Hindi and additional (third) Indian official language
Insulation materials and requirements
Insulation Requirements
Insulation Resistance and Electric Strength
Insulation resistance and electric strength after humidity treatment
Insulation test
Interchangeability
Interconnection of equipment
Internal and external wiring
Internal resistance
Internal short circuit
internal wiring
Leakage Current And Electric Strength
Leakage Current And Electric Strength At Operating Temperature
Likelihood of fire or shock due to entry of conductive objects
Limited current circuits
Low air pressure
Low pressure (cells)
Low temperature test
Low-temperature protection
Luminance Measurement
Marking
Marking and Instructions
Marking & instructions
Marking and designation
MARKING AND INSTRUCTIONS
Measurement conditions
MEASUREMENT OF ENERGY CONSUMPTION
Measurement of Energy Consumption : Active Mode Power Measurement
Measurement of Energy Consumption : Long idle Mode Power Measurement
Measurement of Energy Consumption : Off Mode Power Measurement
Measurement of Energy Consumption : Short idle Mode Power Measurement
Measurement of Energy Consumption : Sleep Mode Power Measurement
Measurements of the stored water temperature
Measuring Point
Mechanical energy source classifications
Mechanical shock (Crash Hazard)
Mechanical state and functioning during test
mechanical strength
Mechanical tests
Message Readability - 22 Indian official languages
Method of mounting and orientation of equipment under test
Microwave power output
Moisture Resistance
Moisture resistance and insulation
Mounting of the water heater
normal operation
Openings in Enclosures
Operational tests for abnormal conditions
Output voltage and current
Over charge test
Overcharge Test
Over-charging of battery
Overcurrent and earth fault protection in primary circuits
Overcurrent protection
Over-discharge protection
Overload Protection Of Transformer And Associated Circuit
OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS
Over-temperature protection
Ozone exposure
Packaging
packaging and transport
Physical requirements : Enclosure
Power Input And Current
POWER INPUTAND CURRENT
Power interface
Preconditioning cycles- Test Procedures
Preconditioning cycles-purpose
Preparation of battery pack
Preparation of battery system
Prospective touch voltage,touch current and protective conductor current
Protection Against Access To Live Parts
Protection Against Accidental Contact With Live Parts
Protection Against Electric Shock
Protection against electrical energy sources
Protection against hazardous moving parts
Protection from electric shock and energy hazards
Protection of personnel – Safety interlocks
Protection of equipment users from overvoltages on telecommunication networks
Protection of telecommunication network service persons, and users of other equipment connected to the network, from hazards in the equipment
Protection of the telecommunication wiring system from overheating
Protective conductor
Protective earthing and bonding
Provision For Earthing
Provision for protective Earthing
Provisions for earthing and bonding
Provisions for protective earthing
Radiation
Radiation Toxicity And Similar Hazards
Rain Test
Rapid temperature cycling (Thermal shock)
Rated Capacity
Reduction of exposure to hazardous substances
REESS Ingress protection requirement
Reference and check points
Reliability prediction - Part count
Reliability prediction - Part Stress Analysis
Reproducibility for random vibration tests : ASD, RMS, PDF
Requirements for safeguards
Requirements for wireless power transmitters
REQUIREMENTS OF A RECHARGEABLE ELECTRICAL ENERGY STORAGE SYSTEM (REESS) WITH REGARD TO ITS SAFETY-General
Resistance to corrosion
Resistance to Dust and moisture
Resistance to Fire
Resistance to flame and ignition
Resistance to heat
Resistance To Heat And Fire
RESISTANCE TO HEAT, FIREAND TRACKING
Resistance To Rusting
Safeguards
Safeguards against fire under normal operating conditions and abnormaloperating conditions
Safeguards against mechanical energy sources
Safeguards against moving parts
Safeguards against parts with sharp edges and corners
Safeguards against thermal energy sources
Safety device operation
Safety extra low voltage circuits - SELV
Safety Interlocks
Safety requirements
Salt fog
Salt Mist
Salt mist test
same as IEC 62368-1: 2018
same as IS 302 (Part2-Sec 25): 2014
Screws And Connections
Screws, Current-Carrying Parts And Connections
SELV Circuits
Shape of construction and constituent parts of secondary lithium-ion cell
Shock Test
Simulated long-life testing at increased random vibration levels
Stability
Stability & Mechanical Hazards
STABILITY AND MECHANICAL HAZARDS
Stability of equipment
Standard Cycle (SC)- Test Procedures
Standard Cycle- Purpose
Standard Loss for 24 Hours
Storage
SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS
Supply current
Surface temperature limitation device operation (for S cells only
Technical Requirements for Traction Battery (REESS) of L CategoryElectric Power Train Vehicles
Technical test for performance
Telephone network voltage circuits - TNV
Temperature cycling
TEMPERATURE RISE
Temperature shock
Terminal For External Conductors
Terminals
Test A: Altitude
Test C: Vibration
Test Conditions
Test D: Shock
Test F: Impact
Test G: Crush
Test H: Forced discharge
Test I: Abnormal charging
Test J: Free fall
Test K: Thermal abuse
Test L: Incorrect installation
Test M: Overdischarge
Test Protocol And Conditions For Type Approval
Test sequence plan
Thermal Abuse
Thermal abuse (cells)
Thermal energy source classifications
Thermal propagation
Thermal Propagation Test
Thermal requirements
Thermal shock and cycling
Thermal test
thermostat setting
TNV Circuits
Topple Test
Toppling
Total circuit power
Touch temperature limits
Transformer Heating
Transient Over-Voltages
Transportation and handling
Trickle charge acceptance for JT cylindrical cells
Tropical exposure
Type approval and batch acceptance
Type test conditions
uniform heating
usable cavity volume
Use of instructional safeguards and instructions
Use of personal safeguards or personal protective equipment (PPE)
Verification of Marking
Verification of Marking & Instructions
Vibration
Vibration ( sinusoidal) test
Vibration (sinusoidal)
Vibration (sinusoidal) test
Vibration Test
Vibration, broadband random and guidance
Vibration, shock and bump test
Water Immersion Test
Watertightness test
Wheels or casters attachment requirements
Wiring terminal for external power conductor
Wiring Terminals For Connection Of External Conductors
Wiring, Connections And Supply